Future TV Room Demolition

Removing plaster and lath is fun, oh so much fun. The future TV room has not been used in a decade by our best estimate. Unlike the rest of the house the floors still sport a thick coat of paint and the walls are done in a very thick layer of a color that has not been in vogue during our lifetimes. The demolition is pretty straightforward, break, pull, break, pull, clean up, start again. Despite respirators being a real annoyance we found that when dealing with plaster dust they really are a must use item. Also, don't be fooled into thinking that all crowbars are the same, we used three different styles on this room and each had a particular place to shine (a cat's paw is indispensable for the removal of little stuff around the edges).
 

Every room has its surprises and this one was no different. We found two old chimney thimbles that have not been in use in decades, a galvanized metal duct which does not go anywhere and was apparently never attached to anything, many chipmunk nests, clapboard siding which marks the west wall as having been exterior at some point and a door that used to go to the hidden room. Before we can close the walls back up we need to address the plumbing to the pink bathroom above, duct work to provide heat to the upstairs north east bedroom, wiring to that same bedroom and insulation to the space above Ermela's room which is accessible via a small crawl space near the chimney. We also need to set this room up for TV use which means sound insulation and special wiring for speakers and electronics....so though it is gutted, it will be a while before we can put it back together and start enjoying it.